Search
vi-VNen-GB
12 Tháng Tư 2026

Dự án

.

Ho Chi Minh City - Moc Bai Expressway Construction and Investment Project (Stage 1)

Project name                         : Ho Chi Minh City - Moc Bai Expressway Construction and Investment Project (Stage 1)

Project Owner                      : HCMC Traffic Works Construction and Investment Project Management Unit

Funding source                      : State budget               

Project location                     : Ho Chi Minh City and Tay Ninh province, Vietnam

Description of the Project    :

Ho Chi Minh City - Moc Bai Expressway Project with a total length of about 51 km has the starting point connecting with Ho Chi Minh City Ring Road 3 in Cu Chi district, Ho Chi Minh City and the ending point intersecting with National Highway 22 (about Km53+850) in Ben Cau district, Tay Ninh province. The project was divided into 04 component projects. The road was designed and built in accordance with the Vietnam’s Expressway Standards (TCVN 5729: 2012), design speed: Vtk=120 km/h. Cross-section scale of the first stage: 04 lanes.

Upon completion, the Project will meet the transportation demand, reduce the traffic load and ensure traffic safety on National Highway 22; complete and synchronously operate ring roads with large capacity, ensure the traffic safety and high speed on Ho Chi Minh City - Tay Ninh transport corridor, develop the industrial - urban chains of Moc Bai - Ho Chi Minh City - Cai Mep Port - Thi Vai associated with the Trans-Asia economic corridor, boost up the socio-economic development of Ho Chi Minh City and Tay Ninh in particular and the provinces of the Southeast Region of Vietnam in general.

The total investment of the Project is: VND 19,617 billion (about USD 842 million).

Services provided by Hung Nghiep:               

  • Topographic, geological and hydrological surveys; survey of construction material quarries; survey of old road surface; survey of waste disposal areas and concrete batchling plants.
  • Survey of the existing structures on the route including road crossings, intersections, power lines, underpasses, canals, culverts and drainage systems;
  • Soft soil treatment design
  • Set up the Building Information Modelling (BIM)
  • Basic design of expresway, bridges, overpasses and underpasses, culverts, drainage systems, ITS system, lighting system and non-stop toll collection system, etc.
  • Prepare total cost estimation
  • Prepare Feasibility Study Report.

x
«Tháng Tư 2026»
T2T3T4T5T6T7CN
303112345
6789101112
13141516171819
20212223242526
27282930123
45678910
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

83 Tạ Hiện, Phường Thạnh Mỹ Lợi, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038/ 
+84 (0) 976 697 168
(+84.28) 6281 1048

Copyright 2026 by HungNghiep Co., Ltd
Back To Top