Dong Dien River Revetment Construction Project

Project name                 : Dong Dien River Revetment Construction Project at the downstream area of Hiep Phuoc Bridge   

Project Owner               : HCMC Inland Waterway Management Zone

Funding source            : State budget

Project location            : Nha Be District, HCMC, Vietnam

Description of the Project:

River revetment construction for bank protection and anti-landslide for the right bank of Dong Dien River at the downstream area of Hiep Phuoc Bridge, and ensure the safety for the local residents surrounding the project area and create beautiful landscape for the area.

Services provided by Hung Nghiep:

  • Topographical and geological survey
  • Basic design
  • Feasibility study report
  • Detailed design
  • Cost estimates
  • Author supervision.

x
«Tháng Mười 2026»
T2T3T4T5T6T7CN
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

83 Tạ Hiện, Phường Thạnh Mỹ Lợi, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038/ 
+84 (0) 976 697 168
(+84.28) 6281 1048

Copyright 2026 by HungNghiep Co., Ltd
Back To Top