Chi Thanh – Van Phong Component Project under the Eastern North – South Expressway Construction Project in the period of 2020 -2025

Project name                     : Chi Thanh – Van Phong Component Project under the Eastern North – South Expressway Construction Project in the period of 2020 -2025

Project Owner                     : PMU 7

Funding source                     : State budget

Project location                    : Phu Yen Province, Vietnam

Description of the Project:

The Eastern North – South Expressway Construction Project in the period of 2020 -2025 has a total length of 729 km, passing through 12 provinces and cities, divided into 12 independent component projects.

Chi Thanh - Van Phong Expressway Component Project has a total length of 48.25 km, passing through Phu Yen province. In the first stage, a four-lane expressway  with a design speed of 80 - 90 km/h was built. In the final stage, a six-lane expressway with a design speed with a design speed of 120 km/h will be built. The Project included a Tuy An tunnel through the mountain with a length of about 1,020 m, 46 underpasses; 5 interchanges; 23 bridges on the main route. The project was classified as a traffic works of Grade I, category A project. The total investment was USD 435 billion (over VND 10,700 billion).

Services provided by Hung Nghiep:

  • Topographic, geological and hydrological surveys; survey of construction material quarries;
  • Survey of the existing structures on the route including road crossings, intersections, power lines, underpasses, canals, culverts and drainage systems;
  • Design of sSoft soil treatment, retaining walls and slope protection
  • Technical design of expresway, bridges, Trumpet-shaped interchange, viaducts, underpasses and culverts, drainage systems, ITS system, lighting system and non-stop toll collection system, etc.
  • Prepare cost estimates
  • Prepare related reports including Topographic, geological and hydrological survey reports, technical design reports, cost estimate report.
Previous Article Cam Lam – Vinh Hao Component Project under the Eastern North – South Expressway Construction Project in the period of 2017 -2020
Next Article Can Tho – Hau Giang Component Project under the Eastern North – South Expressway Construction Project in the period of 2020 -2025

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

83 Tạ Hiện, Phường Thạnh Mỹ Lợi, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top