Search
vi-VNen-GB
20 Tháng Sáu 2025

Danh mục tin tức

«Tháng Sáu 2025»
T2T3T4T5T6T7CN
2627282930311
2345678
9101112131415
16171819202122
23242526272829
30123456

Groundbreaking Ceremony of Ho Chi Minh City Third Ring Road Construction Project, Binh Duong Province Section

On 29 June 2023, the People's Committee of Binh Duong province held the groundbreaking ceremony for Ho Chi Minh City Third Ring Road Project, Binh Duong province section.

The total length of Ho Chi Minh City Third Ring Road Project (RR3) is 76.34 km, divided into 08 component projects (4 civil packages, 4 compensation packages) passing through 04 provinces and city including Dong Nai (11.26km), Binh Duong (11.43km),  Ho Chi Minh city (47.11km), and Long An (6.54km).

A six to eight lanes of expressway is designed with a design speed of 100Km/h. In the first stage, a four-lane expressway with a design speed of 100Km/h will be built. Hung Nghiep provided consulting services for survey, design and cost estimation for the project.

Ho Chi Minh CIty Third Ring Road (RR3) Project aims to facilitate diverting through-traffic and reducing traffic congestion in the center of HCMC. Through construction of RR3, the connectivity of cities and towns surrounding HCMC, Mekong Delta Region and the Eastern Region will also be improved, transport costs and travel times for the movement of passengers and goods in and around HCMC will be reduced.

Previous Article Groundbreaking Ceremony of Ho Chi Minh City Third Ring Road Construction Project, Long An Province Section
Next Article Dự án Đường tỉnh 941 (Đoạn nối dài)

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

83 Tạ Hiện, Phường Thạnh Mỹ Lợi, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top