Ho Chi Minh City Green Transport Development Project, (Package GT-PPTAF-DD-CS1): Detailed Design, Cost Estimate and Preparation Bidding Documents for Construction and Goods Packages

Project name               : Ho Chi Minh City Green Transport Development Project, (Package GT-PPTAF-DD-CS1): Detailed Design, Cost Estimate and Preparation Bidding Documents for Construction and Goods Packages

Project Owner             : Ho Chi Minh City Urban Civil Works Construction Investment Management Authority (UCCI)

Funding source          : World Bank

Project location          : HCMC, Vietnam

Description of the Project:

HCMC Green Transport Development Project includes 2 components:

  • Component 1: Bus Rapid Transit (BRT) corridor development: Construction of BRT corridor No.1 on the Vo Van Kiet - Mai Chi Tho Boulevard (approximately 23 km) and the associated infrastructure such as stations, pedestrian bridges, terminals, technical facility and modern management system. This component will also include investments and operation of BRT buses, as proposed to use compressed natural gas (CNG).
  • Component 2: Institutional Strengthening: This component will finance institutional strengthening and capacity building activities essential to the successful implementation of BRT route, and, more broadly to improve transport and urban development planning in HCMC.

East – West boulevard was selected as the pilot BRT corridor and planned to develop BRT route as a “Green line” for HCMC’s people.

The study required to undertake topographical mapping surveys along the BRT corridor. The mapping scale is designed to cater BRT Line 1, along Vo Van Kiet - Mai Chi Tho Road and part of Hanoi Motorway in Districts 1, 2, 5, 6, 8, Binh Tan and Binh Chanh.

Services provided by Hung Nghiep:

  • Topographical survey
  • Topographical mapping with scale of 1/500 along BRT line 1 corridor.
  • Hydrological survey along BRT corridor (Surface water and canal system along the corridor)
  • Technical infrastructure survey for underground works along the alignment.
  • Topographical survey report.
Previous Article Dự án Kè gia cố bờ sông Đồng Nai đoạn từ khu dân cư dọc sông Rạch Cát phường Thống nhất đến Nhà máy xử lý nước thải số 2 phường Tam Hiệp, thành phố Biên Hòa
Next Article Dự án Hỗ trợ Kỹ thuật Đường Vành đai 3 TPHCM, Gói thầu 01: Dịch vụ Tư vấn lập Dự án Đầu tư và Chính sách An sinh Xã hội các đoạn Bến Lức – Quốc lộ 22 và Quốc lộ 22 – Bình Chuẩn

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

40-42 Nguyễn Hoàng, P.An Phú, Q2, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2024 by HungNghiep Co., Ltd
Back To Top