Search
vi-VNen-GB
09 Tháng Tư 2026

Danh mục tin tức

«Tháng Tư 2026»
T2T3T4T5T6T7CN
303112345
6789101112
13141516171819
20212223242526
27282930123
45678910

Dong Nai River Revetment Construction Project

 

Project name               : Dong Nai River Revetment Construction Project, section from residential area along Rach Cat River, Thong Nhat ward to Wastewater Treatment Plant No.2, Tam Hiep ward, Bien Hoa city

 

Project Owner             : Dong Nai Construction Investment Project Management Unit  

Funding source          : State budget

Project location          : Bien Hoa city, Dong Nai Province, Vietnam

Description of the Project :

Construction of about 3.3km river revetment to protect Dong Nai riverbank including retaining wall made of concrete corrugated sheet piles, footpath and trees. Horizontal and longitudinal drainage culverts, staircase, rescue staircase will be built along the revetment.    

Services provided by Hung Nghiep:

  • Topographical, geological and hydrological surveys
  • Detailed design
  • Preparation of cost estimates.
  • Author supervision.
Previous Article Dự án đầu tư xây dựng cầu Hòa Trung
Next Article Dự án Kè gia cố bờ sông Đồng Nai đoạn từ khu dân cư dọc sông Rạch Cát phường Thống nhất đến Nhà máy xử lý nước thải số 2 phường Tam Hiệp, thành phố Biên Hòa

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

83 Tạ Hiện, Phường Thạnh Mỹ Lợi, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038/ 
+84 (0) 976 697 168
(+84.28) 6281 1048

Copyright 2026 by HungNghiep Co., Ltd
Back To Top