Search
vi-VNen-GB
10 Tháng Ba 2026

Danh mục tin tức

«Tháng Ba 2026»
T2T3T4T5T6T7CN
2324252627281
2345678
9101112131415
16171819202122
23242526272829
303112345

Cay Cam Canal Dredging Project

Project name               : Cay Cam Canal Dredging Project

Project Owner             : Riverway Management Zone

Funding source          : State budget

Project location          : HCMC, Vietnam

Description of the Project:

Cay Cam Canal Dredging Project is to clear the canal for waterway transport demand and to increase the drainage capacity of the canal in order to mitigate environmental pollution. Dredging items included: 

  • Length of dredging: 960m.
  • Bottom width of dredging: 10m
  • Height of dredging: -3.32m (Hon Dau elevation)
  • Slope dredging: m=2

Services provided by Hung Nghiep:

  • Topographical survey
  • Feasibility study report
  • Detailed design
  • Author supervision.
Previous Article Dự án Nâng cấp đô thị vùng đồng bằng sông Cửu Long – Tiểu dự án thành phố Cà Mau, Gói thầu CM-CS-4.8.1
Next Article Dự án nạo vét Rạch Cây Cam

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

83 Tạ Hiện, Phường Thạnh Mỹ Lợi, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038/ 
+84 (0) 976 697 168
(+84.28) 6281 1048

Copyright 2026 by HungNghiep Co., Ltd
Back To Top