Search
vi-VNen-GB
15 Tháng Năm 2025

Danh mục tin tức

«Tháng Năm 2025»
T2T3T4T5T6T7CN
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678

HCMC Urban Railway Construction Project, Line 1 (Ben Thanh – Suoi Tien), Special Assistance for Project Implementation (SAPI)

Project Owner               : Management Authority for Urban Railways of Ho Chi Minh City (MAUR)

Funding source            : JICA

Project location            : HCMC, Vietnam

Description of the Project:

The Study is intended to promote intermodal transportation and transport-oriented development (TOD) by improving accessibility and create the added value of the HCMC Metro Line 1 stations.

Objectives of the SAPI Study are:

  • To develop an implementation plan of feeder bus network along HCMC Metro Line 1;
  • To conduct a feasibility study and basic design of intermodal facilities in station areas of HCMC Metro Line 1; and
  • To recommend policies and regulations for station area urban development.

Services provided by Hung Nghiep:

Hung Nghiep provided consulting services for topographical survey and basic design of intermodal facilities in station areas of HCMC Metro Line 1 and preparation of project investment report.

Previous Article Upgrading and Replacement of Weak Bridges on the National Highways Project, Phase III, Priority 1, Bid package No.3 : Prefeasibility study of 29 bridges from Khanh Hoa Province to Tra Vinh Provinc
Next Article HCMC Urban Railway Construction Project, Line 1 (Ben Thanh – Suoi Tien), Contract Package 2: Civil (Elevated and Depot)

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

40-42 Nguyễn Hoàng, P.An Phú, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top