Search
vi-VNen-GB
14 Tháng Năm 2025

Danh mục tin tức

«Tháng Năm 2025»
T2T3T4T5T6T7CN
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678

Public Transport Infrastructure Improvement Project (BRT from Suoi Tien, Ho Chi Minh city to New Binh Duong city)

Project name               : Public Transport Infrastructure Improvement Project (BRT from Suoi Tien, Ho Chi Minh city to New Binh Duong city)

Project Owner               : Investment and Industrial Development Corporation (BECAMEX IDC)

Funding source            :  Project Owner

Project location            : HCMC and Binh Duong Province, Vietnam

Description of the Project:

The project aims to construct a bus rapit transit (BRT) corridor between Binh Duong New City and Suoi Tien, HCMC. The route is about 30.8km, including the following sections: 

  • Section 1: From the starting point at Mien Dong New Bus station to My Phuoc – Tan Van road,  L=2.3km.
  • Section 2:  My Phuoc – Tan Van road, L=21.2km.
  • Section 3: Pham Ngoc Thach Street, L=4,3km.
  • Section 4: A road in Binh Duong New City, L=3.0km.

Services provided by Hung Nghiep:

  • Prefeasibility study report and feasibility study report of BRT route between Binh Duong New City and Suoi Tien.
  • Basic design of prioritized lane for BRT, flyover bridge, pedestrian bridge and bus stops, 
  • Design of traffic safety system, public transport priority system (PTPS) (or ITS)
  • Preparation of total investment cost.
  • Financial analysis.
Previous Article HCMC Urban Railway Construction Project, Line 1 (Ben Thanh – Suoi Tien), Contract Package 2: Civil (Elevated and Depot)
Next Article Survey and prefeasibility study on priority lane for buses on Dien Bien Phu Street and Vo Thi Sau Street in District 1 and 3, HCMC

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

40-42 Nguyễn Hoàng, P.An Phú, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top