Search
vi-VNen-GB
09 Tháng Năm 2025

Danh mục tin tức

«Tháng Năm 2025»
T2T3T4T5T6T7CN
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678

Go Dua Drainage System Improvement Project

Project name                 : Go Dua Drainage System Improvement, To Ngoc Van – NH1A section

Project Owner               : Project Management Unit 1547

Funding source            : State budget

Project location            : HCMC

Description of the Project:

Construction of drainage system with dimension from Æ600 to Æ2000, reinforced sewer. Dredging and clearing Go Dua canal. Improvement of the existing road surface and sidewalks.

The Project is to increase the drainage capacity, improve the environment sanitation, control and solve the flooding in the area, and silmultaneously cater the waterway transport.

Services provided by Hung Nghiep:

  • Detailed design
  • Preparation of cost estimates.
Previous Article Go Dau Drainage System Improvement Project
Next Article Mekong Delta Transport Infrastructure Development Project, Component C: Ong Dinh Canal Dredging

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

40-42 Nguyễn Hoàng, P.An Phú, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top