Cay Kho Canal Revetmemt Construction Project

 

Project name                 : Cay Kho Canal Revetmemt Construction Project  

Project Owner               : Inland Waterway Management Zone

Funding source            : State budget

Project location            : HCMC, Vietnam

Description of the Project:

Canal revetment is 647m long. Reinforced concrete revetment structure M250 on RC pile foundation M300, dimension 30x30cm, length of 24m. Gabions are placed outside the toe of the revetment to prevent erosion and ensure the stability of revetment slope; geotextiles are placed under the gabions.   

Services provided by Hung Nghiep:

  • Topographical and geological survey
  • Basic design
  • Feasibility study report.
Previous Article La Xuan Oai Drainage System Improvement and Flood Protection Project
Next Article Ong Lon 2 Canal Revetment Construction

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

83 Tạ Hiện, Phường Thạnh Mỹ Lợi, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top