Search
vi-VNen-GB
05 Tháng Chín 2025

Danh mục tin tức

«Tháng Chín 2025»
T2T3T4T5T6T7CN
25262728293031
1234567
891011121314
15161718192021
22232425262728
293012345

Phu Xuan 2 Bridge Construction Project

Project name                 : Phu Xuan 2 Bridge Construction Project  

Project Owner               : Urban Traffic Management Zone 4

Funding source            : State budget

Project location            : HCMC, Vietnam

Description of the Project:

Phu Xuan 2 Bridge crossing Phu Xuan River connects between District 7 and Nha Be District. The bridge is about 279m long and 30m wide. It is a seven Super-T girder bridge made by prestressed reinforced concrete, span layout: 39.15m + 5x40m +39.15m. Design speed: 60km/h.

Services provided by Hung Nghiep:

  • Basic design of bridge, drainage system, lighting and green trees.
  • Soft soil treatment design for approach bridge
  • Feasibility study report
  • Total investment cost.
Previous Article Doc River Bridge Construction Project
Next Article National Highway No.30 Construction Project, Hong Ngu – Dinh Ba Section

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

83 Tạ Hiện, Phường Thạnh Mỹ Lợi, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top