Search
vi-VNen-GB
24 Tháng Giêng 2026

Danh mục tin tức

«Tháng Giêng 2026»
T2T3T4T5T6T7CN
2930311234
567891011
12131415161718
19202122232425
2627282930311
2345678

Mekong Transport and Flood Protection Project, Contract package MD1 and MD2: Construction of retaining walls for erosion protection of National Highway No.1

Project name                 : Mekong Transport and Flood Protection Project, Contract package  MD1 and MD2: Construction of retaining walls for erosion protection of National Highway No.1

Project Owner              : Project Management Unit No.1

Funding source            : World Bank

Project location            : Can Tho, Soc Trang, Bac Lieu and Ca Mau provinces

Description of the Project:

Construction of retaining wall for erosion protection of National Highway No.1, section from Km2086+025 to Km2107+995 (Contract MD1) and section from Km2198+200 to Km 2220+165 (Contract MD2).

Services provided by Hung Nghiep:

  • Topographical survey
  • Technical design and detailed design
  • Cost estimate.
Previous Article Dong Dien River Revetment Construction Project
Next Article Go Dau Drainage System Improvement Project

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

83 Tạ Hiện, Phường Thạnh Mỹ Lợi, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038/ 
+84 (0) 976 697 168
(+84.28) 6281 1048

Copyright 2026 by HungNghiep Co., Ltd
Back To Top