Search
vi-VNen-GB
22 Tháng Sáu 2025

Danh mục tin tức

«Tháng Sáu 2025»
T2T3T4T5T6T7CN
2627282930311
2345678
9101112131415
16171819202122
23242526272829
30123456

National Highway No.30 Construction Project, Hong Ngu – Dinh Ba Section

Project name                 : National Highway No.30 Construction Project, Hong Ngu – Dinh Ba Section  

Project Owner               : Dong Thap Department of Transport

Funding source            : State budget

Project location            : Dong Thap Province, Vietnam

Description of the Project:

The project has a length of 18.589 km and a width of 12m, which has the starting point at Km 94 + 200 - NH30 (at the end of Hong Ngu bypass) and the ending point at Km 118 + 396 - NH30 (Dinh Ba Border’s Economic Zone). The project includes the new construction of 05 RC bridges, widening of 01 bridge and 17 culverts crossing canals. Design scale in accordance with the plain road of grade III.

The project aims to connect major road axis in the border areas such as N1 road, PR841, PR842, PR843 and waterways that will facilitate the socio-economic development in the region and ensure national security. It also links provinces in the region and border gates along the Vietnam-Cambodia border.

Services provided by Hung Nghiep:

  • Topographical, geological and hydrological surveys
  • Pavement strength survey
  • Basic design of road, bridge, culvert and drainage system
  • Soft soil treatment design
  • Preparation of survey report and feasibility study report
  • Preparation of total investment cost.
Previous Article Phu Xuan 2 Bridge Construction Project
Next Article Provincial Road 852B, Stage 2 (North-West Ring Road, Sa Dec City)

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

83 Tạ Hiện, Phường Thạnh Mỹ Lợi, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top