Search
vi-VNen-GB
19 Tháng Năm 2024

Tao Luc Bac Tan Uyen – Phu Giao Road

Project name                 : Tao Luc Bac Tan Uyen – Phu Giao Road

Project Owner               : Becamex IDC

Funding source            : Project Owner

Project location            : Binh Duong Province, Vietnam

Description of the Project:

  • Starting point: connect with Tao Luc Bac Tan Uyen
  • Ending point: at district road 502 at Phu Giao district
  • Total length is 21.8 km (including Tam Lap Bridge, Suoi Giai Bridge and Suoi Rap Bridge)
  • Cross section: 40.50m including 6 lanes + sidewalk (about 2x7m) + median strip of 3m
  • Plain road of grade II, design speed:  80km/h.

Services provided by Hung Nghiep:

  • Topographical, geological and hydrological surveys
  • Design of alignment
  • Preparation of feasibility study and basic design
  • Detailed design
  • Cost estimate
  • Author superivision.
Previous Article Ho Chi Minh City Third Ring Road Technical Assistance Project, Package 1: Consulting Services of Feasibility and Social/Safeguards Studies of Ben Luc - NH22 and NH22 – Binh Chuan Sections
Next Article PR848 Ring Road and Sa Dec 2 Bridge Project, Stage 1

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

40-42 Nguyễn Hoàng, P.An Phú, Q2, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2024 by HungNghiep Co., Ltd
Back To Top