Search
vi-VNen-GB
11 Tháng Chín 2025

Danh mục tin tức

«Tháng Chín 2025»
T2T3T4T5T6T7CN
25262728293031
1234567
891011121314
15161718192021
22232425262728
293012345

Go Dau Drainage System Improvement Project

Project name                 : Go Dau Drainage System Improvement Project, Tan Son Nhi – Binh Long Section  

Project Owner               : Ba Bo Canal Improvement Project Management Unit -  Steering Center of the Urban Flood Control Program in HCMC (SCFC)

Funding source            : State budget

Project location            : Tan Phu District, HCMC

Description of the Project:

Construction of underground drainage system H30-XB80 on Go Dau street, section from Tan Son Nhi to Binh Long, sewer apentures of D1200, D1500 and D2000. Rehabilitation of road base and pavement.

The Project aims to solve the flooding in the area, improve the living environment for the local people and create urban landscape.

Services provided by Hung Nghiep:

  • Topographical and geological survey
  • Preparation of feasibility study report
  • Detailed design
  • Preparation of cost estimates.
Previous Article Mekong Transport and Flood Protection Project, Contract package MD1 and MD2: Construction of retaining walls for erosion protection of National Highway No.1
Next Article Go Dua Drainage System Improvement Project

x
CTY TNHH TƯ VẤN - XÂY DỰNG HƯNG NGHIỆP

83 Tạ Hiện, Phường Thạnh Mỹ Lợi, Thành phố Thủ Đức, TP. Hồ Chí Minh
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top