Dong Nai River Revetment Construction Project

Project name : Dong Nai River Revetment Construction Project, section from residential area along Rach Cat River, Thong Nhat ward to Wastewater Treatment Plant No.2, Tam Hiep ward, Bien Hoa city
Project Owner : Dong Nai Construction Investment Project Management Unit
Funding source : State budget
Project location : Bien Hoa city, Dong Nai Province, Vietnam
Description of the Project :
Construction of about 3.3km river revetment to protect Dong Nai riverbank including retaining wall made of concrete corrugated sheet piles, footpath and trees. Horizontal and longitudinal drainage culverts, staircase, rescue staircase will be built along the revetment.
Services provided by Hung Nghiep:
- Topographical, geological and hydrological surveys
- Detailed design
- Preparation of cost estimates.