Search
vi-VNen-GB
02 April 2025

Projects

.

Tham Luong Canal – Ben Cat – Nuoc Len Ditch Environmental Rehabilitation and Infrastructure Construction Project

It is a key project in HCMC that target to (1) water drainage and flood prevention; (2) environmental improvement and urban refurbishment; (3) traffic connectivity. The project has a total length of 31.46 Km passing through 07 districts in Ho Chi Minh City with total investment cost of USD 331 million (equal to VND 8,200 billion).

Mekong Delta Transport Infrastructure Development Project, Component C: Ong Dinh Canal Dredging

Ong Dinh Canal is located in Ngoc Hien District, Ca Mau city. Total length of the canal is about 17.6km. The starting point of the canal connects with Cua Lon River (on the right bank at Nam Can Town) and the ending point of the canal connects with Rach Goc River at Rach Goc confluence. 

Go Dua Drainage System Improvement Project

Construction of drainage system with dimension from Æ600 to Æ2000, reinforced sewer. Dredging and clearing Go Dua canal. Improvement of the existing road surface and sidewalks.

The Project is to increase the drainage capacity, improve the environment sanitation, control and solve the flooding in the area, and silmultaneously cater the waterway transport.

RSS
«April 2025»
MonTueWedThuFriSatSun
31123456
78910111213
14151617181920
21222324252627
2829301234
567891011
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top