The Project involved infrastructure upgrading in low income areas (LIAs), including:
• Construction of Nguyen Dang road extension and access road to LIA 1;
• Construction of water supply and drainage system for LIAs of Ward 5, 6;
• Construction of water supply and drainage system for LIAs of Ward 7, 8, 9;
• Construction of canal revetment and roads on the two sides of Ben Xuong canal.
The Project was funded by the World Bank under the IDA’s Credit No. 5083-VN.