Tham Luong Canal – Ben Cat – Nuoc Len Ditch Environmental Rehabilitation and Infrastructure Construction Project

It is a key project in HCMC that target to (1) water drainage and flood prevention; (2) environmental improvement and urban refurbishment; (3) traffic connectivity. The project has a total length of 31.46 Km passing through 07 districts in Ho Chi Minh City with total investment cost of USD 331 million (equal to VND 8,200 billion).

Dong Nai River Embankment Construction Project, Bien Hoa City (from Hoa An Bridge to the border of Vinh Cuu District)

Construction of Dong Nai river embankment in Bien Hoa city from Hoa An bridge to the border  of Vinh Cuu district with 5,233m in length. The crest elevation of the embankment is +3.0m and some embankment sections have elevation >+3.0m depending on the riverside road along the park.

Tham Luong Canal – Ben Cat – Nuoc Len Ditch Environmental Rehabilitation and Infrastructure Construction Project

It is a key project in HCMC that target to (1) water drainage and flood prevention; (2) environmental improvement and urban refurbishment; (3) traffic connectivity. The project has a total length of 31.46 Km passing through 07 districts in Ho Chi Minh City with total investment cost of USD 331 million (equal to VND 8,200 billion).

RSS
«March 2025»
MonTueWedThuFriSatSun
242526272812
3456789
10111213141516
17181920212223
24252627282930
31123456
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top