Contract package 2 “Civil (elevated and depot) from Km 2+360 to Km 19+532” under HCMC Urban Railway Construction Project, Line 1 (Ben Thanh – Suoi Tien) included the main work items such as: 05 continous girder bridge with large span, 11 elevated stations, 14.5km viaduct and 01 depot with an area of 27.4 ha.