Loan 3031 VIE: Central Mekong Delta Region Connectivity Project - Project Component No.4: Interconnecting Road to NH.91 and Long Xuyen City Bypass

 

Project name                      : Loan 3031 VIE: Central Mekong Delta Region Connectivity Project - Project Component No.4: Interconnecting Road to NH.91 and Long Xuyen City Bypass

Project Owner                     : PMU My Thuan

Funding source                     : Asian Development Bank

Project location                    : An Giang Province, Vietnam

Description of the Project:

The project component involved (1) the new construction of 15.3 km Long Xuyen City Bypass, starting from Lo Te interchange and ending at an intersection with NH91; (2) Widening, upgrading and improving 2km the existing NH.80 from Lo Te T-junction to the connection with Long Xuyen City Bypass. Scale: 2-carriage-lane asphalted road with 12-m embankment, design speed of 80km/h (except 60km/h for 2-km NH.80), reinforced concrete (RC) and prestressed RC bridges (11 bridges), design load HL-93, bridge width of 12m. Soft soil treatment is required.

Total investment cost is about USD 90 million (equivalent to VND 2,106,71 billion).

Scope of work included (i) Survey, preparation of construction drawings, cost estimates, procurement support and; (ii) Construction Supervision (including defect liabiality period).

Services provided by Hung Nghiep:

  • Topographical survey; geotechnical survey; hydrological survey; and construction material survey and testing.
  • Survey of  the existing structures on the route including crossings, intersections, power transmission line,  canals, culverts, drainage system …
  • Review the approved feasibility study and basic design to determine optimal solutions.
  • Prepare detailed engineering design of structural works including bridges and culverts.
  • Soft soil treatment design by prefabricated vertical drain (PVD) in combination with geo-textile, cement soil column method
  • Prepare Environmental Management Plan (EMP), review the site – specific health and safety management plan prepared by the Contractor
  • Prepare updated resettlement plan, updated Social Action Plan
  • Prepare cost estimates.
  • Prepare all the related reports including: survey reports, detailed design report, cost estimate report,…
  • Construction supervision and project management during the construction of the project.
Previous Article Dai Ngai Bridge Construction Project on the National Highway 60 in the provinces of Tra Vinh and Soc Trang
Next Article Hoang Sa – Doc Soi Road Project

x
«May 2025»
MonTueWedThuFriSatSun
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top