Search
vi-VNen-GB
24 March 2025

Projects

.

Ho Chi Minh City - Moc Bai Expressway Construction and Investment Project (Stage 1)

Project name                         : Ho Chi Minh City - Moc Bai Expressway Construction and Investment Project (Stage 1)

Project Owner                      : HCMC Traffic Works Construction and Investment Project Management Unit

Funding source                      : State budget               

Project location                     : Ho Chi Minh City and Tay Ninh province, Vietnam

Description of the Project    :

Ho Chi Minh City - Moc Bai Expressway Project with a total length of about 51 km has the starting point connecting with Ho Chi Minh City Ring Road 3 in Cu Chi district, Ho Chi Minh City and the ending point intersecting with National Highway 22 (about Km53+850) in Ben Cau district, Tay Ninh province. The project was divided into 04 component projects. The road was designed and built in accordance with the Vietnam’s Expressway Standards (TCVN 5729: 2012), design speed: Vtk=120 km/h. Cross-section scale of the first stage: 04 lanes.

Upon completion, the Project will meet the transportation demand, reduce the traffic load and ensure traffic safety on National Highway 22; complete and synchronously operate ring roads with large capacity, ensure the traffic safety and high speed on Ho Chi Minh City - Tay Ninh transport corridor, develop the industrial - urban chains of Moc Bai - Ho Chi Minh City - Cai Mep Port - Thi Vai associated with the Trans-Asia economic corridor, boost up the socio-economic development of Ho Chi Minh City and Tay Ninh in particular and the provinces of the Southeast Region of Vietnam in general.

The total investment of the Project is: VND 19,617 billion (about USD 842 million).

Services provided by Hung Nghiep:               

  • Topographic, geological and hydrological surveys; survey of construction material quarries; survey of old road surface; survey of waste disposal areas and concrete batchling plants.
  • Survey of the existing structures on the route including road crossings, intersections, power lines, underpasses, canals, culverts and drainage systems;
  • Soft soil treatment design
  • Set up the Building Information Modelling (BIM)
  • Basic design of expresway, bridges, overpasses and underpasses, culverts, drainage systems, ITS system, lighting system and non-stop toll collection system, etc.
  • Prepare total cost estimation
  • Prepare Feasibility Study Report.
Previous Article Dong Nai River Embankment Construction Project, Bien Hoa City (from Hoa An Bridge to the border of Vinh Cuu District)
Next Article Van Phuc Bridge Construction Project crossing the Red River and the interconnecting road to National Highway 32, Phuc Tho district

x
«March 2025»
MonTueWedThuFriSatSun
242526272812
3456789
10111213141516
17181920212223
24252627282930
31123456
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top