Cay Cam Canal Dredging Project
Project name : Cay Cam Canal Dredging Project
Project Owner : Riverway Management Zone
Funding source : State budget
Project location : HCMC, Vietnam
Description of the Project:
Cay Cam Canal Dredging Project is to clear the canal for waterway transport demand and to increase the drainage capacity of the canal in order to mitigate environmental pollution. Dredging items included:
- Length of dredging: 960m.
- Bottom width of dredging: 10m
- Height of dredging: -3.32m (Hon Dau elevation)
- Slope dredging: m=2
Services provided by Hung Nghiep:
- Topographical survey
- Feasibility study report
- Detailed design
- Author supervision.