Search
vi-VNen-GB
05 May 2024

Projects

.

Mekong Delta Region Urban Upgrading Project – Cao Lanh City sub-project, Contract package CL-CS 4.3B

Project name                 : Mekong Delta Region Urban Upgrading Project – Cao Lanh City sub-project, Contract package CL-CS 4.3B

Project Owner               : Project Management Unit of Mekong Delta Region Urban Upgrading Project – Cao Lanh City  Sub-project

Funding source            : WB

Project location            : Dong Thap Province, Vietnam

Description of the Project:

The sub-project involved upgrading and construction of technical infrastructure system in low income areas including: Roads, water supply system, wastewater drainage system, lighting system and social infrastructure works such as community houses, schools, toilets,… The Project was funded by the World Bank under the IDA’s Credit No. 5083-VN.

The objectives of the Project was to promote the sustainable and equal growth with the community and society participation, poverty reduction by improving the living conditions and environment sanitation of low income areas in Cao Lanh city.

Services provided by Hung Nghiep:

  • Carry out topographical, geological, hydrological and existing technical infrastructure surveys.
  • Undertake detailed design of roads, bridge, water supply system, wastewater drainage system, power supply system, lighting system and social infrastructure works.
  • Prepare detailed cost estimates.
  • Prepare bidding documents (civil works packages) for upgrading technical infrastructure including roads, water supply system, water drainage system and lighting system in low income areas of LIA7, LIA10 in Hoa Thuan ward, LIA12 in Tan Thuan Tay – Hoa An ward,  LIA13 in ward 11, LIA14 in Hoa An ward; social infrastructure such as new construction of 01 community cultural house in ward 11 and construction and replacement of 02 nursery schools that have been seriously degraded at Hoa Thuan ward and ward 4, 01 Le Thanh Ton primary school at Hoa An commune, new construction of 01 toilet at ward 1 and 01 toilet at ward 2; Ton Duc Thang street of Component 2.
Previous Article Rach Lao Residential Area Project
Next Article Mekong Delta Region Urban Upgrading Project – Ca Mau City sub-project, Contract package CM-CS-4.8.1

x
«May 2024»
MonTueWedThuFriSatSun
293012345
6789101112
13141516171819
20212223242526
272829303112
3456789
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, District 2, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2024 by HungNghiep Co., Ltd
Back To Top