Search
vi-VNen-GB
06 May 2025

Projects

.

Phu Xuan 2 Bridge Construction Project

Project name                 : Phu Xuan 2 Bridge Construction Project  

Project Owner               : Urban Traffic Management Zone 4

Funding source            : State budget

Project location            : HCMC, Vietnam

Description of the Project:

Phu Xuan 2 Bridge crossing Phu Xuan River connects between District 7 and Nha Be District. The bridge is about 279m long and 30m wide. It is a seven Super-T girder bridge made by prestressed reinforced concrete, span layout: 39.15m + 5x40m +39.15m. Design speed: 60km/h.

Services provided by Hung Nghiep:

  • Basic design of bridge, drainage system, lighting and green trees.
  • Soft soil treatment design for approach bridge
  • Feasibility study report
  • Total investment cost.
Previous Article Doc River Bridge Construction Project
Next Article National Highway No.30 Construction Project, Hong Ngu – Dinh Ba Section

x
«May 2025»
MonTueWedThuFriSatSun
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top