Long Thanh International Airport Project covers an area of 5,000 hectares. The runways, taxiways, aircraft parking lots, passenger terminals and auxiliary works were built in the first stage. Long Thanh International Airport has a capacity of 25 million passengers/year and 1.2 million tons of cargo/year, including a central terminal and 3 wings, with a total floor area of 373,000 m2, consisting of: Check-in island; parking lot; automatic baggage counter; baggage handling systems, security screening, escalators, elevators, pedestrians, etc. The terminal was built on a 150-hectare land area, designed with 2 separate arrival and departure ternminals, including 1 ground floor and 3 floors. The project is expected to be completed in 2026.