Search
vi-VNen-GB
16 February 2025

Projects

.

Long Thanh International Airport Construction Project, Stage 1

Long  Thanh International Airport Project covers an area of ​​5,000 hectares. The runways, taxiways, aircraft parking lots, passenger terminals and auxiliary works were built in the first  stage. Long Thanh International Airport has a capacity of 25 million passengers/year and 1.2 million tons of cargo/year, including a central terminal and 3 wings, with a total floor area of ​​373,000 m2, consisting of: Check-in island; parking lot; automatic baggage counter; baggage handling systems, security screening, escalators, elevators, pedestrians, etc. The terminal was built on a 150-hectare land area, designed with 2 separate arrival and departure ternminals, including 1 ground floor and 3 floors. The project is expected to be completed in 2026. 

Phuoc Tan Residential and Resettlement Area Project

The infrastructure construction project of the resettlement area in Phuoc Tan ward covers a scale of over 49 hectares, including 1,066 resettlement plots with a population of 4,248 people and 4 high-rise blocks with a population of over 3,752 people. The total population of this resettlement area is about 8,000 people. The project will invest in the construction of synchronous and complete technical infrastructure including roads, power supply, water supply, drainage system.

Western Provincial Road DT. 638 Project

The investment and construction of the Western Provincial Road DT.638 was designed according to the Vietnam’s standard of a plain road of grade III, with an embankment width of 22 m and a design speed of 80 km/h. The length of the route is about 121 km; of which the upgraded and widened section of the existing road is about 57 km, and the newly constructed section is about 63.65 km. The route has a starting point interconnecting to the interchange of the main urban axis and the new National Highway 1A, about 250 m from Quy Thuan 2 Bridge to the south, in Hoai Chau Bac Commune, Hoai Nhon Town. The end point is at Km120 + 825, intersected with National Highway 19 at Km27 + 100 in An Nhon Town. The project included the construction of 50 new bridges, including 700-meter Song Con Bridge

Van Phuc Bridge Construction Project crossing the Red River and the interconnecting road to National Highway 32, Phuc Tho district

Van Phuc Bridge will cross the Red River in a section across Phuc Tho District, Hanoi. The bridge has a total length of 7.76km, a width of 20.5m, including 4 lanes for motorized vehicles and 2 lanes for non-motorized vehicles, except the interconnnecting road from  the  National Highway 32 to the Van Coc Lake flyover bridge is 32m wide, with 6 lanes for motorized vehicles and 2 lanes for non-motorized vehicles. 

RSS
«February 2025»
MonTueWedThuFriSatSun
272829303112
3456789
10111213141516
17181920212223
242526272812
3456789
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top