Cam Lo – La Son Component Project under the Eastern North – South Expressway Construction Project in the period of 2017 -2020

 

Project name                         : Cam Lo – La Son Component Project under the Eastern North – South Expressway Construction Project in the period of 2017 -2020

Project Owner                     : Ho Chi Minh Road PMU

Funding source                     : State budget

Project location                    : Quang Tri and Hue Provinces, Vietnam

Description of the Project:

Total length of the Project is about 98.3 km (the sections through Quang Tri and Thua Thien - Hue provinces is about 36.3 km and 62.05 km respectively). In the first phase, two-lane expressway was built with a design speed of 80 km/h, six-lane expressway will be built with a design speed of 100 km/h in the utimate phase. The entire route has 33 bridges on the highway, 16 overpasses, 5 interchanges (interchanges with NH9, NH15D, PR9B & PR14B, NH49 & NH1(Hue City bypass), PR14B). The project was classified as traffic works of Grade I and category A project. Total investment was USD 309 million (equalivalent to VND 7,669 billion).

Hung Nghiep provides Survey, Design, Cost Estimate and Preparation of Bidding Documents Consulting Services including design of expressways, bridges on the route (including 02 medium bridges, 01 large bridge), 01 Trumpet-shaped interchange with TL14B, underpasses and culverts,...

Services provided by Hung Nghiep:

  • Topographic, geological and hydrological surveys; survey of construction material quarries; the existing road surface survey; survey of waste disposal areas and locations of concrete mixing plants.
  • Survey of the existing structures on the route including road crossings, intersections, power lines, underpasses, canals, culverts and drainage systems;
  • Placing site clearance stakes and red-line boundary markers
  • Technical design of expresway, bridges and culverts, drainage systems, etc.
  • Prepare cost estimates and related reports
  • Prepare bidding documents for civil works packages.
Previous Article Diamond Square Trade – Service – Residence Project
Next Article Cam Lam – Vinh Hao Component Project under the Eastern North – South Expressway Construction Project in the period of 2017 -2020

x
«May 2025»
MonTueWedThuFriSatSun
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top