Ho Chi Minh City Third Ring Road Construction Project, Project Component No.5: Binh Duong Province Section

Project name : Ho Chi Minh City Third Ring Road Construction Project, Project Component No.5: Binh Duong Province Section
Project Owner : Traffic Works Construction and Investment Project Management Unit of Binh Duong Province
Funding source : State budget
Project location : Binh Duong Province, Vietnam
Description of the Project:
The total length of Ho Chi Minh City Third Ring Road Project (RR3) is 76.34 km, divided into 08 component projects passing through 04 provinces and city including Dong Nai (11.26km), Binh Duong (11.43km), Ho Chi Minh city (47.11km), and Long An (6.54km). A six to eight lanes of expressway is designed with a design speed of 100Km/h. A four-lane expressway with a design speed of 100Km/h will be built in the first stage.
The Ho Chi Minh CIty Third Ring Road (RR3) Project aims to facilitate diverting through-traffic and reducing traffic congestion in the center of HCMC. Through construction of RR3, the connectivity of cities and towns surrounding HCMC, Mekong Delta Region and the Eastern Region will also be improved, transport costs and travel times for the movement of passengers and goods in and around HCMC will be reduced.
Services provided by Hung Nghiep:
- Topographical survey; geotechnical survey; hydrological survey; and survey of the existing structures
- Soft soil treatment design by prefabricated vertical drain (PVD) in combination with surcharge, cement soil column method, vacuum consolidation method (VCM), geotextile.
- Prepare detailed engineering design of expressway, overpasses, underpasses, interchanges, drainage system, traffic safety system, etc.
- Prepare detailed engineering design of bridges, including Binh Goi bridge (span layout: 39 + 4x40+ 42+63+42 +13x40+39 = 911m).
- Prepare cost estimates.
- Prepare all the related reports including: survey reports, detailed design report, cost estimate report,…