Ho Chi Minh City Third Ring Road Construction Project, Project Component No.5: Binh Duong Province Section

Project name                         : Ho Chi Minh City Third Ring Road Construction Project, Project Component No.5:  Binh Duong Province Section

Project Owner                     : Traffic Works Construction and Investment Project Management Unit of Binh Duong Province

Funding source                     : State budget

Project location                    : Binh Duong Province, Vietnam

Description of the Project:

The total length of Ho Chi Minh City Third Ring Road Project (RR3) is 76.34 km, divided into 08 component projects passing through 04 provinces and city including Dong Nai (11.26km), Binh Duong (11.43km),  Ho Chi Minh city (47.11km), and Long An (6.54km). A six to eight lanes of expressway is designed with a design speed of 100Km/h. A four-lane expressway with a design speed of 100Km/h will be built in the first stage.

The Ho Chi Minh CIty Third Ring Road (RR3) Project aims to facilitate diverting through-traffic and reducing traffic congestion in the center of HCMC. Through construction of RR3, the connectivity of cities and towns surrounding HCMC, Mekong Delta Region and the Eastern Region will also be improved, transport costs and travel times for the movement of passengers and goods in and around HCMC will be reduced.

Services provided by Hung Nghiep:

  • Topographical survey; geotechnical survey; hydrological survey; and survey of  the existing structures
  • Soft soil treatment design by prefabricated vertical drain (PVD) in combination with surcharge, cement soil column method, vacuum consolidation method (VCM), geotextile.
  • Prepare detailed engineering design of expressway, overpasses, underpasses, interchanges, drainage system, traffic safety system, etc.
  • Prepare detailed engineering design of bridges, including Binh Goi bridge (span layout: 39 + 4x40+ 42+63+42 +13x40+39 = 911m).
  • Prepare cost estimates.
  • Prepare all the related reports including: survey reports, detailed design report, cost estimate report,…
Previous Article Ho Chi Minh City Third Ring Road Construction Project, Project Component No.7: Long An Province Section
Next Article Ho Chi Minh City Third Ring Road Construction Project, Project Component No.1: Ho Chi Minh City Section

x
«May 2025»
MonTueWedThuFriSatSun
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top