Long Thanh International Airport Construction Project, Stage 1

Project name                         : Long  Thanh International Airport Construction Project, Stage 1

Project Owner                      : Airports Corporation of Vietnam - CTCP (ACV)

Funding source                      : State budget               

Project location                     : Dong Nai province, Vietnam

Description of the Project    :

Long  Thanh International Airport Project covers an area of ​​5,000 hectares. The runways, taxiways, aircraft parking lots, passenger terminals and auxiliary works were built in the first  stage. Long Thanh International Airport has a capacity of 25 million passengers/year and 1.2 million tons of cargo/year, including a central terminal and 3 wings, with a total floor area of ​​373,000 m2, consisting of: Check-in island; parking lot; automatic baggage counter; baggage handling systems, security screening, escalators, elevators, pedestrians, etc. The terminal was built on a 150-hectare land area, designed with 2 separate arrival and departure ternminals, including 1 ground floor and 3 floors. The project is expected to be completed in 2026. The total investment cost of the Project is about VND 109,111.742 billion (USD 4,466.89 million).

The project's objective is to build a 4F class airport under the criteria of the International Civil Aviation Organization (ICAO). It will be an important international airport of the country with orientation to become one of the international aviation transit centers of the region.

Services provided by Hung Nghiep:

Hung Nghiep provided Consulting Services for Survey and Construction Drawing Design of Project Component 3 -  Major Works in the Airport under Long Thanh International Airport Construction Project, Stage 1:

  • Geological survey and testing: Package No.7 – Consulting Services for survey and preparation of feasibility study report for auxiliary works.
  • Geological survey and testing: Package No.7.5 – Consulting Services for survey and technical design of Cargo Terminal No.1 and remaining auxiliary works.
  • Construction drawing design of Package No.4.8: Construction, equipment installation, preparation of construction drawing design for internal traffic works and technical infrastructure in the airport.
Previous Article Phuoc Tan Residential and Resettlement Area Project
Next Article Tham Luong Canal – Ben Cat – Nuoc Len Ditch Environmental Rehabilitation and Infrastructure Construction Project

x
«March 2025»
MonTueWedThuFriSatSun
242526272812
3456789
10111213141516
17181920212223
24252627282930
31123456
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top