Tao Luc Bac Tan Uyen – Phu Giao Road

Project name : Tao Luc Bac Tan Uyen – Phu Giao Road
Project Owner : Becamex IDC
Funding source : Project Owner
Project location : Binh Duong Province, Vietnam
Description of the Project:
- Starting point: connect with Tao Luc Bac Tan Uyen
- Ending point: at district road 502 at Phu Giao district
- Total length is 21.8 km (including Tam Lap Bridge, Suoi Giai Bridge and Suoi Rap Bridge)
- Cross section: 40.50m including 6 lanes + sidewalk (about 2x7m) + median strip of 3m
- Plain road of grade II, design speed: 80km/h.
Services provided by Hung Nghiep:
- Topographical, geological and hydrological surveys
- Design of alignment
- Preparation of feasibility study and basic design
- Detailed design
- Cost estimate
- Author superivision.