Search
vi-VNen-GB
06 May 2025

Projects

.

Tao Luc Bac Tan Uyen – Phu Giao Road

Project name                 : Tao Luc Bac Tan Uyen – Phu Giao Road

Project Owner               : Becamex IDC

Funding source            : Project Owner

Project location            : Binh Duong Province, Vietnam

Description of the Project:

  • Starting point: connect with Tao Luc Bac Tan Uyen
  • Ending point: at district road 502 at Phu Giao district
  • Total length is 21.8 km (including Tam Lap Bridge, Suoi Giai Bridge and Suoi Rap Bridge)
  • Cross section: 40.50m including 6 lanes + sidewalk (about 2x7m) + median strip of 3m
  • Plain road of grade II, design speed:  80km/h.

Services provided by Hung Nghiep:

  • Topographical, geological and hydrological surveys
  • Design of alignment
  • Preparation of feasibility study and basic design
  • Detailed design
  • Cost estimate
  • Author superivision.
Previous Article Ho Chi Minh City Third Ring Road Technical Assistance Project, Package 1: Consulting Services of Feasibility and Social/Safeguards Studies of Ben Luc - NH22 and NH22 – Binh Chuan Sections
Next Article PR848 Ring Road and Sa Dec 2 Bridge Project, Stage 1

x
«May 2025»
MonTueWedThuFriSatSun
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top