PR848 Ring Road and Sa Dec 2 Bridge Project, Stage 1

Project name : PR848 Ring Road and Sa Dec 2 Bridge Project, Stage 1
Project Owner : Dong Thap Department of Transport
Funding source : State budget
Project location : Dong Thap Province, Vietnam
Description of the Project:
The total length of the Project is 14,7Km and divided into three sections. Plain road of grade III and main urban road, design speed of 80km/h, road width of 12m, pavement width of 9m. The Project has 05 medium bridges crossing river and 01 big bridge (The Sadec 2 Bridge with total length = 448.5 m).
The Project goes through soft soil areas, there fore sand drain or PVD in combination with surcharge is applied.
Services provided by Hung Nghiep:
- Undertake topographical, geotechnical and hydrological surveys.
- Survey social and technical infrastructure works
- Design soft soil treatment.
- Carry out detailed design of bridges, road and culverts.
- Prepare cost estimates.