Ba Cua Bridge Construction Project

Project name : Ba Cua Bridge Construction Project
Project Owner : Urban Traffic Management Zone 2
Funding source : State budget
Project location : HCMC, Vietnam
Description of the Project:
- Ba Cua Bridge is built on the Ho Chi Minh City Ring Road No.2, which have 9 spans and the width of cross section B = 40.00m, total length of the bridge is 556.82m. Design load: HL-93, design speed: 80km/h.
- The Project is built on soft soil area so soft soil treatment is applied for high embankment of approach road.
Services provided by Hung Nghiep:
- Carry out topographical, geological and hydrological surveys
- Conduct basic design and feasibility study
- Undertake detailed design of bridge and approach bridges
- Design soft soil treatment, drainage system, traffic signal system and lighting system
- Prepare cost estimates.