Search
vi-VNen-GB
16 July 2025

Projects

.

Go Dua Drainage System Improvement Project

Project name                 : Go Dua Drainage System Improvement, To Ngoc Van – NH1A section

Project Owner               : Project Management Unit 1547

Funding source            : State budget

Project location            : HCMC

Description of the Project:

Construction of drainage system with dimension from Æ600 to Æ2000, reinforced sewer. Dredging and clearing Go Dua canal. Improvement of the existing road surface and sidewalks.

The Project is to increase the drainage capacity, improve the environment sanitation, control and solve the flooding in the area, and silmultaneously cater the waterway transport.

Services provided by Hung Nghiep:

  • Detailed design
  • Preparation of cost estimates.
Previous Article Go Dau Drainage System Improvement Project
Next Article Mekong Delta Transport Infrastructure Development Project, Component C: Ong Dinh Canal Dredging

x
«July 2025»
MonTueWedThuFriSatSun
30123456
78910111213
14151617181920
21222324252627
28293031123
45678910
Hung Nghiep Construction Consulting Co., Ltd.

83 Ta Hien, Thach My Loi Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top