Project name                 : Cay Kho Canal Revetmemt Construction Project  

Project Owner               : Inland Waterway Management Zone

Funding source            : State budget

Project location            : HCMC, Vietnam

Description of the Project:

Canal revetment is 647m long. Reinforced concrete revetment structure M250 on RC pile foundation M300, dimension 30x30cm, length of 24m. Gabions are placed outside the toe of the revetment to prevent erosion and ensure the stability of revetment slope; geotextiles are placed under the gabions.   

Services provided by Hung Nghiep:

  • Topographical and geological survey
  • Basic design
  • Feasibility study report.
Previous Article La Xuan Oai Drainage System Improvement and Flood Protection Project
Next Article Ong Lon 2 Canal Revetment Construction

x
«May 2025»
MonTueWedThuFriSatSun
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top