Search
vi-VNen-GB
16 September 2025

Projects

.

Ong Lon 2 Canal Revetment Construction

Project name                 : Ong Lon 2 Canal Revetment Construction

Project Owner               : HCMC Inland Waterway Management Zone

Funding source            : State budget

Project location            : Nha Be District, HCMC, Vietnam

Description of the Project:

Canal revetment construction for bank protection and anti-landslide for the left bank of Ong Lon Canal 2 upstream area, revetment length of 677m and revetment width of 10m. The Project is to improve the safety for the local residents alongside the canal and environment sanitation in the areas.

Services provided by Hung Nghiep:

  • Topographical and geological survey
  • Basic design
  • Feasibility study report.
Previous Article Cay Kho Canal Revetmemt Construction Project
Next Article An Nghia Bridge Construction Project

x
«September 2025»
MonTueWedThuFriSatSun
25262728293031
1234567
891011121314
15161718192021
22232425262728
293012345
Hung Nghiep Construction Consulting Co., Ltd.

83 Ta Hien, Thach My Loi Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top