Provincial Road 852B, Stage 2 (North-West Ring Road, Sa Dec City)

Project name                       : Provincial Road 852B, Stage 2 (North-West Ring Road, Sa Dec City)

Project Owner                     : Dong Thap Department of Transport

Funding source                  : State budget

Project location                  : Dong Thap Province

Description of the Project:

  • Starting point (Km3+300) connects with PR848
  • Ending point (km7+645.74) connects with NH80
  • Total length of the Project L= 8.41 Km, cross section B = 12m. High-level pavement A2 (DBST). Design technique of grade III – plain road.
  • There are 04 RC bridges, 08 culverts and 01 intersection. The design load is HL-93; Soft soil treatment is applied for bridge approach roads.

Services provided by Hung Nghiep:

  • Topographical, geological and hydrological surveys
  • Soft soil treatment design
  • Traffic safety system design
  • Detailed design
  • Cost estimate
  • Author supversion.
Previous Article National Highway No.30 Construction Project, Hong Ngu – Dinh Ba Section
Next Article Transport System Project for the Connectivity between Tourism Infrastructure and Agriculture in Dong Thap Province

x
«July 2025»
MonTueWedThuFriSatSun
30123456
78910111213
14151617181920
21222324252627
28293031123
45678910
Hung Nghiep Construction Consulting Co., Ltd.

83 Ta Hien, Thach My Loi Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top