Transport System Project for the Connectivity between Tourism Infrastructure and Agriculture in Dong Thap Province
Project name :Transport System Project for the Connectivity between Tourism Infrastructure and Agriculture in Dong Thap Province
Project Owner : Dong Thap Department of Transport
Funding source : State budget
Project location : Dong Thap Province, Vietnam
Description of the Project:
The project has a total length of about 48 km and width from 9m-16m, including 30 bridges and 26 culverts. The road is designed in accordance with the plain road of grade IV, design speed: 60 km/h. The scope comprised of:
- Construction of PR850 (section from NH30 toPR 846)
- Construction of PR856 (section from NH30 bypass to PR844)
- New construction of bridges on PR844 (section from NH30 to Tam Nong)
The investment objective of the project is to complete the transport system to facilitate the development of Xeo Quyt ecotourism, revolutionary relics; Tram Chim Nature Reserve Area, the world's 2000s RAMSA area, Gao Giong eco-tourism, and silmulstaneously to impplemt the agricultural restructuring program, promote socio-economic development and ensure the national security for the border areas.
Services provided by Hung Nghiep:
- Topographical, geological and hydrological surveys
- Pavement survey
- Staking righ-of-way boundary
- Basic design of road, bridges sand culverts
- Feasibility study report
- Total investment cost.