Provincial Road No. 849, section from PR848 to NH 54

Project name : Provincial Road No. 849, section from PR848 to NH 54
Project Owner : Dong Thap Department of Transport
Funding source : State budget
Project location : Dong Thap Province, Vietnam
Description of the Project:
The project has a total length of 18.4 km, the starting point intersects with PR848 and the ending point intersects with NH54. The project is divided into three sections: Section from PR848 to the intersection with the access road to Cao Lanh Bridge; Section from the intersection between Cao Lanh Bridge and PR849 to NH80 and Section from NH80 to NH54. The project includes upgrading 04 bridges, new construction of 09 bridges and 14 culverts. The embankment width is 10m and pavement width is 7m, design speed is 60km / h.
The construction and investment of PR849 Project is to provide a transport connectivity with Cao Lanh bridge project, NH80, NH54 and PR848 in order to improve the operation efficiency of Cao Lanh bridge and meet traffic demand and commodity transport of local people and also contribute to the economic, cultural and social development of the southern districts of Tien River, Dong Thap Province as well as the Mekong Delta Region.
Services provided by Hung Nghiep:
- Topographical, geological and hydrological surveys
- Pavement strength survey
- Design of road, bridge, culvert and drainage system
- Soft soil treatment design
- Preparation of survey report and feasibility study report.
- Preparation of total investment cost.