Hau Giang – Ca Mau Component Project under the Eastern North – South Expressway Construction Project in the period of 2020 -2025

Project name                         : Hau Giang – Ca Mau Component Project under the Eastern North – South Expressway Construction Project in the period of 2020 -2025

Project Owner                     : PMU My Thuan

Funding source                     : State budget

Project location                    : Hau Giang and Ca Mau Provinces, Vietnam

Description of the Project:

The Eastern North – South Expressway Construction Project in the period of 2020 -2025 has a total length of 729 km, passing through 12 provinces and cities, divided into 12 independent component projects.

Hau Giang - Ca Mau component project has a starting point at Km53+000 and an ending point at Km126+223,  including 73.22km expressway and 16.60 km connecting road, with a total investment of USD 676.07 million (over VND 17,152 billion), passing through Hau Giang, Bac Lieu, Kien Giang and Ca Mau Provinces. In the first stage the four-lane expressway (width = 17m) will be built and the ultimate stage it will be widened to 24.7m with four lanes. Design speed: 100Km/h.

Hung Nghiep provided consulting services for a section from Km 84+100 to Km86+600; upgrading and widening of the existing road from IC12 to Vo Van Kiet Street. Total length of 8.8km including 11 bridges and  Interchange IC08.

Services provided by Hung Nghiep:

  • Topographic, geological and hydrological surveys
  • Soft soil treatment design
  • Technical design of expresway, bridges, viaducts, underpasses and culverts, drainage systems, ITS system, lighting system and non-stop toll collection system, etc.
  • Prepare cost estimates
  • Prepare related reports including Topographic, geological and hydrological survey reports, technical design reports, cost estimate report.
Previous Article Can Tho – Hau Giang Component Project under the Eastern North – South Expressway Construction Project in the period of 2020 -2025
Next Article Mai Son – National Highway 45 Component Project under the Eastern North – South Expressway Construction Project in the period of 2017 -2020

x
«May 2025»
MonTueWedThuFriSatSun
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top