Component Project No.1 under Chau Doc – Can Tho – Soc Trang Expressway Construction Project, Stage 1

Project name                         : Component Project No.1 under Chau Doc – Can  Tho – Soc Trang Expressway Construction Project, Stage 1

Project Owner                     : Management Board of Investment Projects for Construction of Transport and Agricultural Works of An Giang Province

Funding source                     : State budget

Project location                    : Can Tho and An Giang Provinces, Vietnam

Description of the Project:

Total length of the expressway is 57.014km (the section through An Giang is 56.434km long; the section through Can Tho is 0.58km long).

+ Starting point: At Km0+314 intersected with the connecting  road to National Highway 91 in Chau Doc city, An Giang province.

+ Ending point: At Km57+328.32, intersected with Component Project 2, located in Vinh Thanh district, Can Tho city.

+ Construction of 33 bridges, including: 32 bridges on the expressway, 01 bridge on PR.945 over the expressway, 03 partial cloverleaf interchanges, 02 underpasses, etc.

Services provided by Hung Nghiep:

  • Topographic, geological and hydrological surveys; survey of construction material quarries; survey of old road surface; survey of waste disposal areas and concrete batchling plants.
  • Survey of the existing structures on the route including road crossings, intersections, power lines, underpasses, canals, culverts and drainage systems;
  • Piling site clearance stakes and red line construction boundary markers
  • Soft soil treatment design by prefabricated vertical drains (PVD) in combination with geotextiles;  soil cement column
  • Basic design of expresway, bridges, viaducts, underpasses and culverts, drainage systems, ITS system, lighting system and non-stop toll collection system, etc.
  • Prepare total cost estimation
  • Prepare Feasibility Study Report.
Previous Article Mai Son – National Highway 45 Component Project under the Eastern North – South Expressway Construction Project in the period of 2017 -2020
Next Article Component Project No.2 under Bien Hoa – Vung Tau Expressway Construction Project, Stage 1

x
«May 2025»
MonTueWedThuFriSatSun
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top