Hoang Sa – Doc Soi Road Project

Project name : Hoang Sa – Doc Soi Road Project
Project Owner : Traffic Works Construction and Investment Project Management Unit of Quang Ngai Province
Funding source : State budget
Project location : Quang Ngai Province, Vietnam
Description of the Project:
The total length of the Proejct is about 27km, starting at Km1+300 connecting to Tri Binh - Dung Quat road and ending at K28+188 connecting to Hoang Sa street at the Tra Khuc dam bridge intersection in Quang Ngai city. The road is designed according to the standard of urban main street, with a design speed of 60 km/h and an embankment width of 46m. The entire route consists of 9 bridges with lengths ranging from 35m to 424m, especially for the Bridge No. 2 crossing Tra Bong river, which is designed with an extradosed bridge structure, span layout: 2x39.1+ 50 +75+50+ 39.1+ 2x40 + 39.1 = 423.8 m.
When completed, the route will help connect Quang Ngai city with Dung Quat Economic Zone, reduce traffic congestion on National Highway 1 and promote the socio-economic development of the Province. Total investment is about USD 141 million (equal to VND 3,500 billion).
Services provided by Hung Nghiep:
- Soft soil treatment design applying the prefabricated vertical drain (PVD) and sand drain methods.
- Construction drawing design of highway, bridges, culverts, intersetions, drainage system, traffic safety system, etc.