Search
vi-VNen-GB
06 May 2025

Projects

.

PR848 Ring Road and Sa Dec 2 Bridge Project, Stage 1

Project name                 : PR848 Ring Road and Sa Dec 2 Bridge Project, Stage 1  

Project Owner               : Dong Thap Department of Transport

Funding source            : State budget

Project location            : Dong Thap Province, Vietnam

Description of the Project:

The total length of the Project is 14,7Km and divided into three sections. Plain road of grade III and main urban road, design speed of 80km/h, road width of 12m, pavement width of 9m. The Project has 05 medium bridges crossing river and 01 big bridge (The Sadec 2 Bridge with total length = 448.5 m).

The Project goes through soft soil areas, there fore sand drain or PVD in combination with surcharge is applied.

Services provided by Hung Nghiep:

  • Undertake topographical, geotechnical and hydrological surveys.
  • Survey social and technical infrastructure works
  • Design soft soil treatment.
  • Carry out detailed design of bridges, road and culverts.
  • Prepare cost estimates.
Previous Article Tao Luc Bac Tan Uyen – Phu Giao Road
Next Article TA 7924-VIE: Second Greater Mekong Subregion Southern Coastal Corridor (Additional Financing)

x
«May 2025»
MonTueWedThuFriSatSun
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top