Search
vi-VNen-GB
18 January 2025

Projects

.

Dong Nai River Embankment Construction Project, Bien Hoa City (from Hoa An Bridge to the border of Vinh Cuu District)

Construction of Dong Nai river embankment in Bien Hoa city from Hoa An bridge to the border  of Vinh Cuu district with 5,233m in length. The crest elevation of the embankment is +3.0m and some embankment sections have elevation >+3.0m depending on the riverside road along the park.

Tham Luong Canal – Ben Cat – Nuoc Len Ditch Environmental Rehabilitation and Infrastructure Construction Project

It is a key project in HCMC that target to (1) water drainage and flood prevention; (2) environmental improvement and urban refurbishment; (3) traffic connectivity. The project has a total length of 31.46 Km passing through 07 districts in Ho Chi Minh City with total investment cost of USD 331 million (equal to VND 8,200 billion).

Ho Chi Minh City Third Ring Road Construction Project, Project Component No.1: Ho Chi Minh City Section

The total length of Ho Chi Minh City Third Ring Road Project (RR3) is 76.34 km, divided into 08 component projects passing through 04 provinces and city including Dong Nai (11.26km), Binh Duong (11.43km),  Ho Chi Minh city (47.11km), and Long An (6.54km). A six to eight lanes of expressway is designed with a design speed of 100Km/h. A four-lane expressway with a design speed of 100Km/h will be built in the first stage.

Ho Chi Minh City Third Ring Road Construction Project, Project Component No.5: Binh Duong Province Section

The total length of Ho Chi Minh City Third Ring Road Project (RR3) is 76.34 km, divided into 08 component projects passing through 04 provinces and city including Dong Nai (11.26km), Binh Duong (11.43km),  Ho Chi Minh city (47.11km), and Long An (6.54km). A six to eight lanes of expressway is designed with a design speed of 100Km/h. A four-lane expressway with a design speed of 100Km/h will be built in the first stage.

Ho Chi Minh City Third Ring Road Construction Project, Project Component No.7: Long An Province Section

The total length of Ho Chi Minh City Third Ring Road Project (RR3) is 76.34 km, divided into 08 component projects passing through 04 provinces and city including Dong Nai (11.26km), Binh Duong (11.43km),  Ho Chi Minh city (47.11km), and Long An (6.54km). A six to eight lanes of expressway is designed with a design speed of 100Km/h. A four-lane expressway with a design speed of 100Km/h will be built in the first stage.

RSS
«January 2025»
MonTueWedThuFriSatSun
303112345
6789101112
13141516171819
20212223242526
272829303112
3456789
Hung Nghiep Construction Consulting Co., Ltd.

40-42 Nguyen Hoang, An Phu Ward, Thu Duc City, HCMC, Vietnam
contact@hungnghiep.com
(+84.28) 6281 1038
(+84.28) 6281 1048

Copyright 2025 by HungNghiep Co., Ltd
Back To Top